Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
990
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0589 # 03 Y:2000 | 03 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $34,765 | $0 | Implemented |
UD0589 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,192 | $640 | Implemented |
UD0589 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,943 | $6,246 | Not Implemented |
UD0589 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,077 | $4,500 | Not Implemented |
UD0579 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $250,000 | $325,000 | Not Implemented |
UD0579 # 02 Y:1999 | 02 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,726 | $7,500 | Implemented |
UD0579 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,050 | $8,000 | Implemented |
UD0579 # 04 Y:1999 | 04 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,690 | $2,850 | Implemented |
UD0579 # 05 Y:1999 | 05 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,782 | $2,000 | Not Implemented |
UD0579 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $0 | Implemented |
UM0132 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,280 | $7,301 | Implemented |
UM0132 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $680 | $700 | Implemented |
UM0132 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $667 | $300 | Implemented |
UM0132 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $349 | $1,000 | Implemented |
UM0132 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $815 | $990 | Implemented |
UM0132 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,503 | $3,700 | Implemented |
UM0132 # 07 Y:1999 | 07 | 1999 | USE LOW VOC OR WATER BASED PAINT | $5,439 | $500 | Implemented |
UM0132 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,333 | $1,548 | Not Implemented |
UM0114 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,627 | $3,217 | Implemented |
UM0114 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,918 | $17,712 | Implemented |
UM0114 # 03 Y:1998 | 03 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $1,806 | $192 | Not Implemented |
UM0114 # 04 Y:1998 | 04 | 1998 | $22,312 | $2,560 | Not Implemented | |
UM0114 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $22,600 | $2,400 | Implemented |
UM0114 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $16,900 | $33,000 | Not Implemented |
UD0530 # 01 Y:1997 | 01 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,055 | $2,200 | Not Implemented |