IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0241 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,900 $4,800 Not Implemented
UM0241 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $10,510 Implemented
UM0241 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,275 $2,100 Implemented
UM0241 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $75 Implemented
UM0230 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,775 $18,691 Not Implemented
UM0230 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,479 $300 Not Implemented
UM0230 # 03 Y:2003 03 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,163 $4,500 Implemented
UM0230 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,688 $8,100 n/a
UM0230 # 05 Y:2003 05 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $37,100 $171,200 Not Implemented
UM0230 # 06 Y:2003 06 2003 USE OPTIMUM THICKNESS INSULATION $4,200 $1,500 Not Implemented
UM0196 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $4,832 Implemented
UM0196 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $8,645 $19,064 Implemented
UM0196 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $450 Implemented
UM0196 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,496 $2,500 Implemented
UM0196 # 05 Y:2001 05 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,344 $1,750 Not Implemented
UM0196 # 06 Y:2001 06 2001 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $46,825 $45,535 Implemented
UM0146 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,736 $220 Not Implemented
UM0146 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $78 $200 Not Implemented
UM0146 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $2,510 $200 Not Implemented
UM0146 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,807 $40,000 Not Implemented
UM0146 # 05 Y:1999 05 1999 USE A RAG RECYCLE SERVICE $925 $0 Not Implemented
UM0146 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $6,000 $3,600 Not Implemented
UM0146 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,207 $40,000 Not Implemented
ND0320 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $131 $0 Implemented
ND0320 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $695 $1,893 Implemented