IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

287

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0187 # 09 Y:2000 09 2000 $397,208 $44,000 Not Implemented
UD0602 # 01 Y:2000 01 2000 $643,500 $150,000 Implemented
UD0602 # 02 Y:2000 02 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $91,844 $0 Not Implemented
UD0602 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,455 $31,020 Not Implemented
UD0602 # 04 Y:2000 04 2000 $8,807 $7,600 Not Implemented
UD0600 # 01 Y:2000 01 2000 $74,100 $16,000 Implemented
UD0600 # 02 Y:2000 02 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $11,664 $4,200 Not Implemented
UD0600 # 03 Y:2000 03 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,810 $0 Not Implemented
UD0600 # 04 Y:2000 04 2000 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $3,780 $1,200 Not Implemented
UD0600 # 05 Y:2000 05 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,938 $7,000 Not Implemented
AS0280 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,109 $12,163 Implemented
AS0280 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,996 $2,925 Not Implemented
AS0280 # 03 Y:2000 03 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,658 $1,605 Implemented
AS0280 # 04 Y:2000 04 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,673 $30,000 Implemented
AS0280 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,337 $1,066 Implemented
AS0280 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,719 $60 Not Implemented
AS0280 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $683 $220 Not Implemented
AS0280 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $995 $378 Implemented
AS0280 # 09 Y:2000 09 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $287 $60 Implemented
AS0280 # 10 Y:2000 10 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $444 $60 Not Implemented
AS0280 # 11 Y:2000 11 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $697 $60 Not Implemented
AS0280 # 12 Y:2000 12 2000 $136,234 $16,000 Not Implemented
AS0280 # 13 Y:2000 13 2000 $212,800 $30,000 Not Implemented
WV0197 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $286 $50 Implemented
WV0197 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $813 $23 Implemented