IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0433 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,008 $21,730 Not Implemented
UM0433 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,580 $1,000 Not Implemented
UM0433 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $37,193 $1,000 Implemented
UM0433 # 02 Y:2013 02 2013 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $19,439 $2,500 Implemented
UM0387 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $57,295 $12,490 Not Implemented
UM0387 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $21,900 $55,250 Not Implemented
UM0387 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $131,444 $85,000 Not Implemented
UM0387 # 02 Y:2011 02 2011 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $139,284 $750,000 Not Implemented
UM0387 # 01 Y:2011 01 2011 OPERATE BOILERS ON HIGH FIRE SETTING $48,827 $157,500 Not Implemented
UM0303 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,089 $1,000 Not Implemented
UM0303 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,020 $7,545 Not Implemented
UM0303 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,914 $1,100 Implemented
UM0303 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $338,489 $344,200 Not Implemented
UM0303 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $2,659 $552 Not Implemented
UM0212 # 03 Y:2002 03 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,407 $500 Not Implemented
UM0212 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,270 $3,417 Not Implemented
UM0212 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,885 $2,786 Not Implemented
UM0212 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $2,000 $1,000 Not Implemented
UM0212 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $10,035 Not Implemented
UM0212 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59,075 $182,900 Not Implemented
UM0180 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,120 $2,100 Implemented
UM0180 # 03 Y:2001 03 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,580 $950 Implemented
UM0180 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $750 Implemented
UM0180 # 04 Y:2001 04 2001 $54,000 $16,000 Implemented
UM0153 # 03 Y:2000 03 2000 REUSE SCRAP GLASS AS FEED STOCK $7,831 $0 Not Implemented