Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

744

matching recommendations
Reset
SIC 323 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0460 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200 $0 Not Implemented
CO0460 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $166,400 $40,000 Implemented
CO0460 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,730 $122,000 Implemented
UF0243 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,393 $0 Implemented
UF0243 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,494 $0 Implemented
UF0243 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $629 $0 Not Implemented
UF0243 # 04 Y:2000 04 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,816 $0 Implemented
UF0243 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,493 $0 Implemented
UF0243 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $17,680 $0 Implemented
UF0239 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,938 $0 Not Implemented
UF0239 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,096 $0 Implemented
UF0239 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,982 $0 Implemented
UF0239 # 04 Y:1999 04 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $53,580 $0 Implemented
UF0239 # 05 Y:1999 05 1999 CLEAR AND RENT EXISTING SPACE $118,736 $0 Not Implemented
AS0259 # 01 Y:1999 01 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,440 $3,500 Not Implemented
AS0259 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $623 $1,400 Not Implemented
AS0259 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $155 $100 Not Implemented
AS0259 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $242 $240 Not Implemented
AS0259 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,717 $120 Not Implemented
AS0259 # 06 Y:1999 06 1999 RECOVER AND REUSE COOLING WATER $27 $38 Not Implemented
AS0259 # 07 Y:1999 07 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $34,440 $1,220 Not Implemented
SF0175 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,293 $3,150 Implemented
SF0175 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,834 $3,195 Not Implemented
SF0175 # 03 Y:1999 03 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $769 $466 Not Implemented
SF0175 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,740 $1,817 Implemented