Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 327 Concrete, Gypsum, And Plaster Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0898 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $303 $270 Implemented
OK0898 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,132 $1,689 Implemented
OK0898 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $463 Implemented
OK0898 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $6,545 $27,400 Implemented
OK0641 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $194,258 $42,750 Implemented
OK0635 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,624 $2,468 Implemented
OK0635 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,873 $300 Implemented
OK0635 # 11 Y:2002 11 2002 INSTALL SET-BACK TIMERS $149 $312 Implemented
OK0635 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $440 Implemented
OK0635 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,070 $200 Implemented
OK0491 # 07 Y:1996 07 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $109 $62 Implemented
OK0491 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $234 $400 Implemented
OK0491 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,329 $30 Implemented
OK0491 # 03 Y:1996 03 1996 USE OPTIMUM THICKNESS INSULATION $12,771 $37,950 Implemented
OK0491 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $655 Implemented
OK0432 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,384 $30,309 Implemented
OK0432 # 03 Y:1994 03 1994 USE PHOTOCELL CONTROLS $1,649 $120 Implemented
OK0348 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $759 Implemented
OK0348 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $292 $0 Implemented
OK0348 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,267 $400 Implemented
OK0348 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $132 $0 Implemented
OK0348 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $0 Implemented
OK0333 # 09 Y:1991 09 1991 INSTALL TIMERS AND/OR THERMOSTATS $574 $1,050 Implemented
OK0333 # 08 Y:1991 08 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $197 $410 Implemented
OK0333 # 03 Y:1991 03 1991 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,653 $1,800 Implemented