Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 327 | Concrete, Gypsum, And Plaster Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0898 # 04 Y:2014 | 04 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $303 | $270 | Implemented |
OK0898 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,132 | $1,689 | Implemented |
OK0898 # 07 Y:2014 | 07 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $136 | $463 | Implemented |
OK0898 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $6,545 | $27,400 | Implemented |
OK0641 # 07 Y:2002 | 07 | 2002 | USE OPTIMUM THICKNESS INSULATION | $194,258 | $42,750 | Implemented |
OK0635 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,624 | $2,468 | Implemented |
OK0635 # 05 Y:2002 | 05 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,873 | $300 | Implemented |
OK0635 # 11 Y:2002 | 11 | 2002 | INSTALL SET-BACK TIMERS | $149 | $312 | Implemented |
OK0635 # 09 Y:2002 | 09 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,632 | $440 | Implemented |
OK0635 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,070 | $200 | Implemented |
OK0491 # 07 Y:1996 | 07 | 1996 | INSTALL / REPAIR INSULATION ON STEAM LINES | $109 | $62 | Implemented |
OK0491 # 06 Y:1996 | 06 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $234 | $400 | Implemented |
OK0491 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,329 | $30 | Implemented |
OK0491 # 03 Y:1996 | 03 | 1996 | USE OPTIMUM THICKNESS INSULATION | $12,771 | $37,950 | Implemented |
OK0491 # 05 Y:1996 | 05 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $329 | $655 | Implemented |
OK0432 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,384 | $30,309 | Implemented |
OK0432 # 03 Y:1994 | 03 | 1994 | USE PHOTOCELL CONTROLS | $1,649 | $120 | Implemented |
OK0348 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $321 | $759 | Implemented |
OK0348 # 03 Y:1991 | 03 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $292 | $0 | Implemented |
OK0348 # 02 Y:1991 | 02 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $1,267 | $400 | Implemented |
OK0348 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $132 | $0 | Implemented |
OK0348 # 01 Y:1991 | 01 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,500 | $0 | Implemented |
OK0333 # 09 Y:1991 | 09 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $574 | $1,050 | Implemented |
OK0333 # 08 Y:1991 | 08 | 1991 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $197 | $410 | Implemented |
OK0333 # 03 Y:1991 | 03 | 1991 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,653 | $1,800 | Implemented |