IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3273 Ready-mixed Concrete
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2317 # 05 Y:2023 05 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $30,104 $300,000 Implemented
UW2317 # 04 Y:2023 04 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $31,756 $1,000,000 Implemented
UW2317 # 03 Y:2023 03 2023 INSTALL STORM WINDOWS AND DOORS $156 $1,901 Implemented
UW2317 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $658 $1,096 Implemented
UW2317 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
UW2315 # 02 Y:2023 02 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $30,104 $300,000 Implemented
UW2315 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,189 $1,896 Implemented
UW2308 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $491 $1,096 Implemented
UW2308 # 06 Y:2023 06 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $36,635 $0 Implemented
UW2308 # 05 Y:2023 05 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $47,887 $200,000 Implemented
UW2308 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $206 $1,815 Implemented
UW2308 # 03 Y:2023 03 2023 INSTALL STORM WINDOWS AND DOORS $145 $1,901 Implemented
UW2308 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,223 $0 Implemented
UW2305 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,031 $0 Implemented
UW2305 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,115 $5,102 Implemented
UW2305 # 02 Y:2023 02 2023 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $3,266 $4,565 Implemented
UW2305 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $4,074 Implemented
BS0061 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,605 $74,360 Implemented
BS0061 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $702 Implemented
OR0438 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,500 $150 Implemented
OR0438 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $3,000 Implemented
OR0438 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,950 $0 Implemented
OR0438 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,850 $24,500 Implemented