IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 3274 Lime
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0713 # 01 Y:2016 01 2016 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $453,910 $3,100,000 Not Implemented
AM0713 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $58,650 $76,000 Implemented
AM0713 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,870 $16,220 Implemented
AM0713 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $4,600 $0 Implemented
AM0713 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,460 $3,900 Implemented
AM0664 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $46,500 $51,870 Not Implemented
AM0664 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,030 $3,600 Implemented
AM0664 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,750 $12 Not Implemented
AM0664 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $7,770 $1,200 Implemented
AM0664 # 05 Y:2014 05 2014 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $5,260 $0 Implemented
AM0664 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,970 $4,550 Implemented
AM0664 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $625 $870 Implemented
IA0456 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $565 $50 Implemented
IA0456 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $657 $50 Implemented
IA0456 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $385 $717 Not Implemented
IA0456 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $1,799 Implemented
IA0456 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,332 $3,835 Not Implemented
IA0456 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,544 $16,376 Implemented
IA0456 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,067 $2,774 Not Implemented
IA0456 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,524 $0 Implemented
AM0428 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,180 $500 Not Implemented
AM0428 # 01 Y:2003 01 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,600 $4,000 Implemented
AM0428 # 03 Y:2003 03 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,020 $0 Implemented
OK0641 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $194,258 $42,750 Implemented
OK0641 # 06 Y:2002 06 2002 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $47,600 $71,935 n/a