IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0367 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,318 $11,290 Implemented
SU0273 # 02 Y:2008 02 2008 USE SYNTHETIC LUBRICANT $3,284 $0 Implemented
SU0273 # 03 Y:2008 03 2008 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $84,581 $7,850 Implemented
SU0273 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,737 $128 Implemented
SU0273 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $631 $44 Implemented
SU0273 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,553 $10,014 Implemented
SU0273 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $3,954 $14,012 Implemented
SU0273 # 10 Y:2008 10 2008 MINIMIZE WATER USAGE $133,075 $550,000 Implemented
MS0332 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $771,322 $1,000 Implemented
MS0332 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,875 $65,823 Implemented
MS0332 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,591 $401 Implemented
MS0332 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,696 $6,360 Implemented
MS0332 # 06 Y:2008 06 2008 USE OPTIMUM THICKNESS INSULATION $143 $108 Implemented
GT0847 # 02 Y:2008 02 2008 REUSE SCRAP GLASS AS FEED STOCK $729,921 $850,000 Implemented
UD0777 # 04 Y:2008 04 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $70,469 $40,000 Implemented
UD0777 # 06 Y:2008 06 2008 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $35,664 $50,000 Implemented
UD0777 # 07 Y:2008 07 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $35,347 $15,000 Implemented
UD0777 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,252 $1,000 Implemented
UD0777 # 12 Y:2008 12 2008 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $8,318 $19,000 Implemented
UD0777 # 13 Y:2008 13 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,240 $0 Implemented
UD0777 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $3,815 Implemented
IC0133 # 02 Y:2007 02 2007 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $22,188 $0 Implemented
IC0133 # 04 Y:2007 04 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,000 $0 Implemented
WV0362 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,397 $0 Implemented
WV0362 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,787 $0 Implemented