Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,280
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0925 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $4,804 | $34,000 | Not Implemented |
UD0925 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,759 | $5,000 | Not Implemented |
UD0925 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,964 | $1,000 | Implemented |
UD0925 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,405 | $66,200 | Not Implemented |
UD0925 # 08 Y:2015 | 08 | 2015 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $7,714 | $120,000 | Implemented |
UD0925 # 09 Y:2015 | 09 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,400 | $0 | Not Implemented |
UK1408 # 01 Y:2014 | 01 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $15,613 | $3,894 | Not Implemented |
UK1408 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,448 | $2,000 | Implemented |
UK1408 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $7,600 | $17,000 | Not Implemented |
UK1408 # 04 Y:2014 | 04 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $40,960 | $204,000 | Not Implemented |
UK1408 # 05 Y:2014 | 05 | 2014 | OPTIMIZE PLANT POWER FACTOR | $36,000 | $32,528 | Implemented |
UK1408 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $217,346 | $140,476 | Not Implemented |
UK1408 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580,500 | $386,500 | Not Implemented |
UD0909 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,106 | $510 | Not Implemented |
UD0909 # 02 Y:2014 | 02 | 2014 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,680 | $1,125 | Implemented |
UD0909 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $16,710 | $4,000 | Not Implemented |
UD0909 # 04 Y:2014 | 04 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $759 | $500 | Not Implemented |
UD0909 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $2,940 | Implemented |
UD0909 # 06 Y:2014 | 06 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,214 | $5,000 | Implemented |
UD0909 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,032 | $1,000 | Implemented |
UD0909 # 08 Y:2014 | 08 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,327 | $3,000 | Not Implemented |
UD0909 # 09 Y:2014 | 09 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $797 | $0 | Implemented |
UD0909 # 10 Y:2014 | 10 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $797 | $0 | Implemented |
UD0909 # 11 Y:2014 | 11 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $7,664 | $8,319 | Not Implemented |
UD0909 # 12 Y:2014 | 12 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,987 | $17,000 | Not Implemented |