IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,280

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0080 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $585 $150 Implemented
WV0080 # 07 Y:1996 07 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,162 $1,612 Not Implemented
WV0080 # 08 Y:1996 08 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,196 $4,800 Implemented
WV0080 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $116 $278 Implemented
WV0080 # 10 Y:1996 10 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,167 $2,450 Not Implemented
WV0080 # 11 Y:1996 11 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $19,781 $11,500 Not Implemented
WV0080 # 12 Y:1996 12 1996 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME $13,000 $66,000 Not Implemented
WV0080 # 13 Y:1996 13 1996 USE PLASTIC PALLETS INSTEAD OF WOOD $22,914 $20,240 Implemented
UD0472 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,440 $30,000 Implemented
UD0472 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,193 $300 Implemented
UD0472 # 03 Y:1995 03 1995 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $5,725 $0 Not Implemented
UD0472 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,365 $25,782 Implemented
UD0472 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $14,630 $37,500 Not Implemented
GT0562 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $82,460 $0 Implemented
GT0562 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,980 $0 Implemented
GT0561 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $473,300 $1,050,000 Implemented
GT0561 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $166,370 $235,000 Not Implemented
GT0561 # 03 Y:1995 03 1995 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $99,420 $0 Not Implemented
GT0561 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,950 $4,550 Implemented
GT0561 # 05 Y:1995 05 1995 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $349,805 $1,000,000 Not Implemented
GT0561 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,730 $201,600 Implemented
OD0010 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,348 $3,873 Implemented
OD0010 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $965 $800 Implemented
OD0010 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,624 $25 Implemented
OD0010 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $927 $7,684 Implemented