Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0144 # 06 Y:1999 | 06 | 1999 | REDUCE SCRAP PRODUCTION | $29,091 | $5,000 | Implemented |
MS0139 # 05 Y:1999 | 05 | 1999 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $169 | $574 | Not Implemented |
MS0139 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,224 | $554 | Implemented |
MS0139 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $61,739 | $26,241 | Implemented |
MS0139 # 02 Y:1999 | 02 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $219 | $591 | Implemented |
MS0139 # 01 Y:1999 | 01 | 1999 | USE PHOTOCELL CONTROLS | $3,484 | $490 | Not Implemented |
UM0144 # 07 Y:1999 | 07 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $7,680 | $584 | Implemented |
UM0144 # 05 Y:1999 | 05 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,848 | $2,100 | Not Implemented |
UM0144 # 04 Y:1999 | 04 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $5,837 | $9,350 | Not Implemented |
UM0144 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $350 | Implemented |
UM0144 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $647 | $1,000 | Implemented |
UM0144 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,661 | $110 | Implemented |
GT0662 # 01 Y:1999 | 01 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,196 | $3,800 | Implemented |
GT0662 # 06 Y:1999 | 06 | 1999 | RECOVER AND REUSE COOLING WATER | $85,620 | $30,000 | Implemented |
GT0662 # 07 Y:1999 | 07 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,775 | $0 | Not Implemented |
GT0662 # 08 Y:1999 | 08 | 1999 | COMBINE UTILITY METERS | $14,794 | $0 | Not Implemented |
GT0662 # 03 Y:1999 | 03 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $424,479 | $250,000 | Implemented |
GT0662 # 05 Y:1999 | 05 | 1999 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $68,343 | $60,000 | Implemented |
GT0662 # 02 Y:1999 | 02 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $22,317 | $550 | Implemented |
GT0662 # 04 Y:1999 | 04 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $16,138 | $30,000 | Not Implemented |
OD0134 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,153 | $800 | Not Implemented |
OD0134 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,888 | $13,066 | Not Implemented |
OD0134 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $8,350 | $30,000 | Not Implemented |
OD0134 # 04 Y:1999 | 04 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $92,062 | $180,000 | Not Implemented |
OR0341 # 04 Y:1999 | 04 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $1,300 | $6,600 | Not Implemented |