IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0235 # 07 Y:2006 07 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $22,786 $30,000 Implemented
LE0235 # 09 Y:2006 09 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,444 $6,000 Implemented
LE0235 # 11 Y:2006 11 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,908 $7,500 Implemented
LE0235 # 12 Y:2006 12 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,006 $1,000 Implemented
LL0251 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $19,891 $2,392 Implemented
LL0251 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $6,369 $9,300 Implemented
LL0251 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $634 $787 Implemented
MS0294 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $172 Implemented
MS0294 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,240 $609 Implemented
IC0113 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $10,036 $0 Implemented
IC0113 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,683 $66,529 Implemented
IC0113 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,398 $8,517 Implemented
IC0113 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $900 Implemented
UD0732 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,274 $2,000 Implemented
UD0732 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $14,687 $0 Implemented
UD0732 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,718 $0 Implemented
UD0732 # 08 Y:2006 08 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $9,263 $0 Implemented
UD0732 # 10 Y:2006 10 2006 UPGRADE CONTROLS ON COMPRESSORS $2,569 $0 Implemented
UD0732 # 13 Y:2006 13 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $0 Implemented
UD0732 # 14 Y:2006 14 2006 REPAIR AND ELIMINATE STEAM LEAKS $1,138 $600 Implemented
UD0732 # 15 Y:2006 15 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $783 $720 Implemented
UF0374 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $43,329 $868 Implemented
UF0374 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,278 $12,817 Implemented
UF0374 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,506 $4,360 Implemented
UF0374 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,005 $1,355 Implemented