IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0450 # 07 Y:2004 07 2004 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $140 $40 Implemented
LE0176 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $114,214 $25,000 Implemented
LE0176 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,003 $1,000 Implemented
LE0176 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,825 $0 Implemented
WV0282 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $17,179 $1,140 Implemented
WV0282 # 04 Y:2004 04 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,151 $0 Implemented
WV0282 # 06 Y:2004 06 2004 DEVELOP A REPAIR/REPLACE POLICY $3,646 $1,140 Implemented
WV0282 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,390 $4,448 Implemented
WV0282 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,387 $250 Implemented
WV0282 # 10 Y:2004 10 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $923 $715 Implemented
WV0282 # 12 Y:2004 12 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,784 $76 Implemented
WV0282 # 14 Y:2004 14 2004 ISOLATE HOT OR COLD EQUIPMENT $5,688 $690 Implemented
MS0239 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,196 $17,859 Implemented
MS0239 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,584 $15,350 Implemented
MS0239 # 05 Y:2003 05 2003 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,265 $6,000 Implemented
MS0239 # 07 Y:2003 07 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,839 $1,000 Implemented
AM0448 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,266,100 $805,000 Implemented
AM0448 # 02 Y:2003 02 2003 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $24,300 $5,730 Implemented
AM0448 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,000 $2,000 Implemented
AM0448 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $4,032 $0 Implemented
AM0448 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $2,200 $2,000 Implemented
AM0448 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,120 $25 Implemented
AM0448 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $500 $70 Implemented
AM0448 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,600 $0 Implemented
AM0448 # 10 Y:2003 10 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,780 $0 Implemented