IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0032 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,454 $19,500 Implemented
SF0234 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Implemented
SF0234 # 08 Y:2002 08 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,441 $49,000 Implemented
LE0131 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,624 $0 Implemented
LE0131 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,376 $4,500 Implemented
IC0031 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,703 $10,800 Implemented
IC0031 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,312 $3,338 Implemented
IC0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $2,894 Implemented
IC0031 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,800 $3,080 Implemented
WI0415 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,596 $1,000 Implemented
WI0415 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,086 Implemented
WI0415 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $307 $68 Implemented
MS0204 # 07 Y:2002 07 2002 DISCONNECT BALLASTS $129 $256 Implemented
MS0204 # 08 Y:2002 08 2002 PAY BILLS ON TIME TO AVOID LATE FEES $89 $25 Implemented
MI0026 # 02 Y:2002 02 2002 CONDENSE OPERATION INTO ONE BUILDING $23,625 $714 Implemented
MI0026 # 03 Y:2002 03 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $16,250 $60 Implemented
MI0026 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,497 $60 Implemented
MI0026 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $160 $2 Implemented
LM0028 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $10,685 $980 Implemented
LM0028 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,807 $800 Implemented
LM0028 # 08 Y:2002 08 2002 MODIFY WORKLOAD $202,176 $2,200 Implemented
UD0637 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,187 $8,190 Implemented
UD0637 # 02 Y:2002 02 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,149 $3,200 Implemented
UD0637 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,139 $9,000 Implemented
UD0637 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $230 $0 Implemented