IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,321

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0250 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,521 $5,040 Implemented
LL0250 # 03 Y:2006 03 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,864 $474 Not Implemented
LL0250 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,081 $60 Not Implemented
LL0250 # 05 Y:2006 05 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,580 $596 Not Implemented
LL0250 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $427 $60 Not Implemented
LL0250 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $294 $30 Not Implemented
MA0604 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $33,327 $2,600 Not Implemented
MA0604 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,912 $14,335 Implemented
MA0604 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,796 $67,450 Not Implemented
MA0604 # 04 Y:2006 04 2006 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $8,539 $8,050 Implemented
MA0604 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,518 $12,500 Not Implemented
MA0604 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $3,250 $8,000 Not Implemented
MA0604 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $13,536 Implemented
OK0730 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,839 $1,000 Not Implemented
OK0730 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,500 $1,237 Implemented
OK0730 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,533 $3,500 Implemented
OK0730 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $948 $158 Not Implemented
OK0730 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $767 Implemented
OK0730 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,565 $8,601 Not Implemented
OK0730 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,886 $1,767 Implemented
LM0118 # 01 Y:2006 01 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $8,571 $10,004 Not Implemented
LM0118 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $969 $2,578 Not Implemented
LM0118 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,104 $425 Implemented
LM0118 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $5,931 $0 Not Implemented
LE0235 # 01 Y:2006 01 2006 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,380,000 $3,000,000 Not Implemented