IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,516

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0310 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $9,894 $3,000 Not Implemented
SD0310 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,878 $280 Implemented
SD0310 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,797 $0 Implemented
SD0310 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,916 $2,000 Not Implemented
SD0310 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $4,000 Not Implemented
SD0310 # 09 Y:2003 09 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,770 $0 Implemented
SD0310 # 10 Y:2003 10 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $10,000 $15,000 Not Implemented
SD0310 # 11 Y:2003 11 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $5,000 Not Implemented
IC0050 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,686 $5,950 Not Implemented
IC0050 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $763 $1,874 Not Implemented
IC0050 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,932 $2,500 Not Implemented
IC0050 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,218 $3,335 Not Implemented
IC0050 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,156 $610 Not Implemented
IC0050 # 06 Y:2003 06 2003 UPGRADE CONTROLS ON COMPRESSORS $2,173 $1,520 Not Implemented
IC0050 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,130 $6,689 Not Implemented
IC0050 # 08 Y:2003 08 2003 MOVE PRODUCT USING MECHANICAL MEANS $59,605 $227,720 Not Implemented
AM0425 # 01 Y:2003 01 2003 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $1,157,000 $0 Not Implemented
AM0425 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $243,880 $16,000 Implemented
AM0425 # 03 Y:2003 03 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $154,000 $2,000 Implemented
AM0425 # 04 Y:2003 04 2003 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $110,500 $0 Implemented
AM0425 # 05 Y:2003 05 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $42,200 $700 Implemented
AM0425 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,700 $650 Implemented
AM0425 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $13,500 $16,800 Implemented
AM0425 # 08 Y:2003 08 2003 PAY BILLS ON TIME TO AVOID LATE FEES $2,006 $0 Implemented
IC0049 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $7,074 $11,051 Not Implemented