Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,364
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0292 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,121 | $2,933 | Implemented |
MO0292 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,365 | $11,960 | Implemented |
MO0292 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,842 | $339 | Implemented |
MO0292 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,013 | $80 | Implemented |
MO0292 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $350 | $0 | Implemented |
MO0292 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $800 | $0 | Implemented |
MO0292 # 07 Y:2000 | 07 | 2000 | ELIMINATE SHIFT | $1,400,000 | $2,000,000 | Not Implemented |
MO0292 # 08 Y:2000 | 08 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $6,804 | $500 | Not Implemented |
OD0166 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,013 | $8,525 | n/a |
OD0166 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,297 | $520 | n/a |
OD0166 # 03 Y:2000 | 03 | 2000 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $13,669 | $113,000 | n/a |
OD0166 # 04 Y:2000 | 04 | 2000 | METER WASTE WATER | $20,038 | $6,955 | n/a |
UM0175 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $455 | $1,000 | Not Implemented |
UM0175 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,249 | $600 | Implemented |
UM0175 # 03 Y:2000 | 03 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,332 | $6,000 | Not Implemented |
UM0175 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $1,824 | $2,288 | Not Implemented |
UM0175 # 05 Y:2000 | 05 | 2000 | USE OPTIMUM THICKNESS INSULATION | $3,029 | $1,324 | Not Implemented |
UM0175 # 06 Y:2000 | 06 | 2000 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $9,120 | $7,313 | Not Implemented |
SD0250 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,106 | $210,000 | Not Implemented |
SD0250 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,752 | $600 | Implemented |
SD0250 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,942 | $4,100 | Not Implemented |
SD0250 # 04 Y:2000 | 04 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,901 | $40,000 | Not Implemented |
SD0250 # 05 Y:2000 | 05 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $3,256 | $8,000 | Not Implemented |
SD0250 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $148,200 | $8,000 | Not Implemented |
SD0250 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $97,460 | $135,000 | Not Implemented |