Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,321
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0171 # 08 Y:2000 | 08 | 2000 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $39,357 | $4,000 | Implemented |
BD0171 # 09 Y:2000 | 09 | 2000 | MINIMIZE WATER USAGE | $209 | $805 | Implemented |
BD0171 # 10 Y:2000 | 10 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $863,728 | $550,000 | Not Implemented |
BD0171 # 11 Y:2000 | 11 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $936 | $1,400 | Implemented |
BD0171 # 12 Y:2000 | 12 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $350 | $200 | Not Implemented |
UM0174 # 01 Y:2000 | 01 | 2000 | INSULATE BARE EQUIPMENT | $4,136 | $3,600 | Not Implemented |
UM0174 # 02 Y:2000 | 02 | 2000 | USE OPTIMUM THICKNESS INSULATION | $5,460 | $490 | Not Implemented |
UM0174 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,906 | $1,200 | Implemented |
UM0174 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,038 | $500 | Implemented |
UM0174 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $530 | $350 | Implemented |
UM0174 # 06 Y:2000 | 06 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $5,080 | $25,000 | Not Implemented |
UM0174 # 07 Y:2000 | 07 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $7,800 | $2,000 | Implemented |
UM0173 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $573 | $800 | Not Implemented |
UM0173 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $225 | Not Implemented |
UM0173 # 03 Y:2000 | 03 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $758 | $700 | Not Implemented |
UM0173 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $3,506 | $800 | Not Implemented |
UM0173 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,300 | $750 | Not Implemented |
SF0200 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,619 | $2,800 | Not Implemented |
SF0200 # 02 Y:2000 | 02 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,726 | $7,750 | Not Implemented |
SF0200 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,122 | $13,280 | Not Implemented |
SF0200 # 04 Y:2000 | 04 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $24,800 | $0 | Not Implemented |
SF0200 # 05 Y:2000 | 05 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $16,728 | $70,000 | Not Implemented |
CO0473 # 01 Y:2000 | 01 | 2000 | IMPROVE COMBUSTION CONTROL CAPABILITY | $74,960 | $1,050 | Implemented |
CO0473 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,150 | $400 | Implemented |
CO0473 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,360 | $10,000 | Implemented |