IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0163 # 09 Y:1985 09 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $462 $140 Implemented
KU0163 # 10 Y:1985 10 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,233 $50 Not Implemented
KU0163 # 11 Y:1985 11 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130 $180 Implemented
KU0163 # 12 Y:1985 12 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $357 $455 Implemented
KU0163 # 13 Y:1985 13 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $324 $175 Implemented
KU0163 # 14 Y:1985 14 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,054 $500 Not Implemented
KU0163 # 15 Y:1985 15 1985 IMPROVE LUBRICATION PRACTICES $1,119 $1,016 Not Implemented
KU0163 # 16 Y:1985 16 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,273 $1,000 Implemented
KU0163 # 17 Y:1985 17 1985 INSTALL AUTOMATIC STACK DAMPER $363 $900 Implemented
KU0163 # 18 Y:1985 18 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $160 $0 Implemented
KU0163 # 19 Y:1985 19 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11 $0 Not Implemented
KU0163 # 20 Y:1985 20 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,287 $2,874 Not Implemented
ST0033 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,091 $340 Not Implemented
ST0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,963 $0 Implemented
ST0033 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $576 $100 Implemented
ST0033 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $853 $200 Not Implemented
ST0033 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,080 $1,900 Implemented
ST0033 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $1,488 $0 Not Implemented
ST0033 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $1,100 $3,100 Not Implemented
ST0033 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,936 $537 Implemented
ST0033 # 09 Y:1985 09 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $504 $40 Implemented
ST0033 # 10 Y:1985 10 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,126 $1,770 Not Implemented
ST0033 # 11 Y:1985 11 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,383 $87 Not Implemented
ST0033 # 12 Y:1985 12 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $384 $0 Implemented
ST0033 # 13 Y:1985 13 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $39,416 $45,000 Not Implemented