Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0824 # 20 Y:2010 20 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,372 $11,000 Not Implemented
UD0692 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $47,634 $0 Not Implemented
UD0692 # 02 Y:2004 02 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,960 $6,000 Not Implemented
UD0692 # 03 Y:2004 03 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,672 $344 Not Implemented
UD0692 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,575 $325 Implemented
UD0692 # 05 Y:2004 05 2004 COVER OPEN TANKS $888 $3,450 Implemented
UD0692 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $570 $0 Not Implemented
UD0692 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $400 Implemented
UD0692 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $155 $53 Not Implemented
UD0608 # 01 Y:2000 01 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $27,415 $15,000 Implemented
UD0608 # 02 Y:2000 02 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,231 $1,200 Implemented
UD0608 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,027 $6,250 Implemented
UD0608 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,480 $14,755 Implemented
UD0608 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $4,156 $3,500 Not Implemented
UD0608 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,103 $0 Not Implemented
UD0608 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,709 $4,624 Not Implemented
UD0593 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $75,117 $0 Not Implemented
UD0593 # 02 Y:2000 02 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $42,268 $45,000 Implemented
UD0593 # 03 Y:2000 03 2000 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $36,834 $55,945 Not Implemented
UD0593 # 04 Y:2000 04 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,243 $6,080 Implemented
UD0593 # 05 Y:2000 05 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,710 $0 Not Implemented
UD0571 # 01 Y:1999 01 1999 RECYCLE CASTING SAND $227,844 $135,000 Implemented
UD0571 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $67,000 $24,000 Not Implemented
UD0571 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $27,700 $40,000 Not Implemented
UD0571 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,000 $64,000 Implemented