IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0168 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,060 $8,140 Implemented
IP0168 # 10 Y:2022 10 2022 USE PHOTOCELL CONTROLS $237 $727 Implemented
IP0168 # 09 Y:2022 09 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $254 $600 Implemented
IP0168 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,542 $5,311 Implemented
IP0168 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $939 $713 Implemented
IP0168 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,045 $4,576 Implemented
IP0168 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,513 $4,848 Implemented
IP0168 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,112 $22,920 Implemented
IP0168 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,815 $12,140 Implemented
IP0168 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,243 $0 Implemented
TT0246 # 03 Y:2020 03 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $492,629 $66,000 Implemented
TT0246 # 02 Y:2020 02 2020 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $955,149 $750,000 Implemented
TT0246 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,939 $31,200 Implemented
IC0048 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $17,986 $0 Implemented
IC0048 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $56,765 $35,050 Implemented
IC0048 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,279 $10,600 Implemented
IC0048 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $7,063 $0 Implemented
IC0031 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,312 $3,338 Implemented
IC0031 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,800 $3,080 Implemented
IC0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $2,894 Implemented
IC0031 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,703 $10,800 Implemented
ND0328 # 01 Y:1999 01 1999 $12,717 $27,395 Implemented
ND0328 # 03 Y:1999 03 1999 $6,212 $7,590 Implemented
ND0328 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $912 $950 Implemented
ND0328 # 08 Y:1999 08 1999 $285 $0 Implemented