Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
865
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0184 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,142 | $12,019 | Implemented |
IP0184 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,216 | $17,960 | Implemented |
IP0184 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,667 | $2,615 | Implemented |
IP0184 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $83,429 | $20,365 | Implemented |
IP0184 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,493 | $0 | Implemented |
SD0643 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $489 | $250 | Implemented |
SD0643 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $338 | $424 | Implemented |
SD0643 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM TEMPERATURE | $6,846 | $0 | Implemented |
MZ0352 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,053 | $160 | Implemented |
MZ0352 # 10 Y:2023 | 10 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $49,532 | $3,900 | Implemented |
MZ0352 # 09 Y:2023 | 09 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,760 | $3,671 | Implemented |
MZ0352 # 04 Y:2023 | 04 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,502 | $320 | Implemented |
MZ0352 # 08 Y:2023 | 08 | 2023 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $38,678 | $132,100 | Implemented |
MZ0352 # 07 Y:2023 | 07 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,709 | $750 | Implemented |
MZ0352 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,256 | $56,316 | Implemented |
MZ0352 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,882 | $315 | Implemented |
MZ0352 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,627 | $2,400 | Implemented |
MZ0352 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,512 | $15,473 | Implemented |
DL0225 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,072 | $500 | Implemented |
DL0225 # 08 Y:2023 | 08 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,068 | $28,750 | Implemented |
DL0225 # 02 Y:2023 | 02 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,327 | $0 | Implemented |
DL0225 # 01 Y:2023 | 01 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,327 | $0 | Implemented |
DL0225 # 07 Y:2023 | 07 | 2023 | IMPROVE HANDLING PRACTICES | $25,825 | $10,000 | Implemented |
UC2308 # 02 Y:2023 | 02 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $41,561 | $0 | Implemented |
UC2308 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $204,687 | $50,000 | Implemented |