IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

845

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0351 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,215 $35,243 Implemented
WV0288 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,141 $360 Implemented
WV0288 # 05 Y:2004 05 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,212 $1,200 Implemented
WV0288 # 06 Y:2004 06 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,772 $27,600 Implemented
WV0288 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $4,573 $1,000 Implemented
WV0288 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,932 $50 Implemented
WV0288 # 10 Y:2004 10 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,739 $575 Implemented
WV0288 # 13 Y:2004 13 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $203 $25 Implemented
WV0288 # 14 Y:2004 14 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $200 Implemented
WV0280 # 02 Y:2003 02 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $78,750 $1,000 Implemented
WV0280 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $27,160 $750 Implemented
WV0280 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,252 $750 Implemented
WV0280 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,348 $100 Implemented
WV0280 # 09 Y:2003 09 2003 USE SYNTHETIC LUBRICANT $4,705 $250 Implemented
WV0280 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,080 $477 Implemented
WV0280 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $7,230 Implemented
MA0537 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,446 $10,396 Implemented
MA0537 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $464 $150 Implemented
MA0537 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $154 $0 Implemented
UF0323 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,288 $23,205 Implemented
UF0323 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,966 $104,168 Implemented
UF0323 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,475 $370 Implemented
UF0323 # 06 Y:2003 06 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,790 $65 Implemented
UF0323 # 10 Y:2003 10 2003 $69,343 $420,000 Implemented
WV0257 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented