Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
865
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0206 # 03 Y:2022 | 03 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $15,730 | $3,713 | Implemented |
UU0206 # 04 Y:2022 | 04 | 2022 | PAY UTILITY BILLS ON TIME | $23,515 | $750 | Implemented |
UU0206 # 05 Y:2022 | 05 | 2022 | MINIMIZE WATER USAGE | $5,292 | $1,764 | Implemented |
UU0206 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,019 | Implemented |
SF0586 # 08 Y:2022 | 08 | 2022 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $62,090 | $317,631 | Implemented |
SF0586 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,736 | $14,830 | Implemented |
SF0586 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $1,974 | $4,260 | Implemented |
SF0586 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,916 | $68,135 | Implemented |
SF0586 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,428 | $26,487 | Implemented |
SF0586 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,078 | $22,361 | Implemented |
SF0586 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,868 | $0 | Implemented |
SF0586 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,887 | $0 | Implemented |
UU0196 # 06 Y:2022 | 06 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $510 | $640 | Implemented |
UU0196 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $779 | $750 | Implemented |
UU0196 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,096 | $323 | Implemented |
UU0196 # 01 Y:2022 | 01 | 2022 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $10,923 | $250 | Implemented |
UU0196 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $1,732 | $7,647 | Implemented |
TT0261 # 07 Y:2021 | 07 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,374 | $0 | Implemented |
TT0261 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $26,082 | $700 | Implemented |
TT0261 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $49,358 | $3,200 | Implemented |
TT0261 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $188,912 | $733,702 | Implemented |
IP0136 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $672 | $0 | Implemented |
IP0136 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $921 | $0 | Implemented |
IP0136 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,455 | $69 | Implemented |
IP0136 # 05 Y:2020 | 05 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,685 | $10,860 | Implemented |