IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0834 # 04 Y:2012 04 2012 KEEP BOILER TUBES CLEAN $810 $500 Implemented
OK0834 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $1,500 Implemented
OK0834 # 08 Y:2012 08 2012 UPGRADE CONTROLS ON COMPRESSORS $4,641 $0 Implemented
OK0834 # 01 Y:2012 01 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,800 $0 Implemented
MS0204 # 08 Y:2002 08 2002 $89 $25 Implemented
MS0204 # 07 Y:2002 07 2002 DISCONNECT BALLASTS $129 $256 Implemented
OK0616 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,387 $4,428 Implemented
OK0616 # 10 Y:2001 10 2001 $540,000 $125,040 Implemented
OK0616 # 02 Y:2001 02 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,570 $1,040 Implemented
AR0160 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,689 $3,628 Implemented
AR0160 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $272 $1,750 Implemented
AR0160 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,374 $50 Implemented
AR0160 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,048 $5,000 Implemented
AR0160 # 06 Y:1999 06 1999 REDUCE SCRAP PRODUCTION $120,000 $80,000 Implemented
AR0099 # 06 Y:1996 06 1996 MAINTAIN MACHINES TO REDUCE LEAKS $7,300 $600 Implemented
AR0099 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,537 $200 Implemented
AR0099 # 03 Y:1996 03 1996 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $13,886 $13,040 Implemented
AR0099 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,354 $2,920 Implemented
AR0099 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,044 $1,143 Implemented
LT0077 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $373 $170 Implemented
LT0077 # 04 Y:1986 04 1986 COVER OPEN TANKS $1,540 $20 Implemented
LT0077 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,457 $1,160 Implemented
LT0077 # 06 Y:1986 06 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,400 $0 Implemented
LT0066 # 02 Y:1986 02 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,230 $12,000 Implemented