IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1901 # 16 Y:2019 16 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,281 $1,000 Implemented
UK1901 # 11 Y:2019 11 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $280 Implemented
UK1901 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,440 $106,123 Implemented
UK1901 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $283 $520 Implemented
UK1901 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $507 $245 Implemented
UK1901 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,843 $2,270 Implemented
UK1901 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,381 $750 Implemented
UK1811 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,133 $2,270 Implemented
UK1811 # 05 Y:2018 05 2018 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,503 $0 Implemented
UK1811 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $2,332 $4,270 Implemented
UK1811 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $282 $164 Implemented
UK1508 # 13 Y:2015 13 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,138 $12,000 Implemented
UK1508 # 12 Y:2015 12 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,063 $3,260 Implemented
UK1508 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,700 $1,700 Implemented
UK1508 # 10 Y:2015 10 2015 INSTALL COMMON HEADER ON COMPRESSORS $4,650 $2,950 Implemented
UK1508 # 08 Y:2015 08 2015 UPGRADE OBSOLETE EQUIPMENT $1,302 $746 Implemented
UK1508 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,722 $193 Implemented
UL0237 # 02 Y:1999 02 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,512 $0 Implemented
UL0227 # 05 Y:1999 05 1999 $5,430 $1,799 Implemented
UL0207 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,709 $120 Implemented
UL0207 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $20 Implemented
UL0207 # 05 Y:1998 05 1998 $306,800 $117,500 Implemented
UL0183 # 06 Y:1997 06 1997 $130,000 $2,400 Implemented
UL0183 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $2,200 Implemented