Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsSIC | 3353 | Aluminum Sheet, Plate, And Foil |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0257 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $61,834 | $281,530 | Implemented |
WV0257 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $18,309 | $36,855 | Implemented |
WV0257 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,020 | $0 | Implemented |
WV0257 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,738 | $220 | Implemented |
WV0257 # 11 Y:2003 | 11 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,974 | $6,300 | Implemented |
WV0257 # 12 Y:2003 | 12 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $19,542 | $1,375 | Implemented |
WV0257 # 09 Y:2003 | 09 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $37,016 | $1,000 | Implemented |
WV0257 # 13 Y:2003 | 13 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $538 | $2,900 | Implemented |
WV0257 # 14 Y:2003 | 14 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $954 | $110 | Implemented |
MS0204 # 07 Y:2002 | 07 | 2002 | DISCONNECT BALLASTS | $129 | $256 | Implemented |
MS0204 # 08 Y:2002 | 08 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $89 | $25 | Implemented |
OK0616 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,387 | $4,428 | Implemented |
OK0616 # 10 Y:2001 | 10 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $540,000 | $125,040 | Implemented |
OK0616 # 02 Y:2001 | 02 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,570 | $1,040 | Implemented |
SD0274 # 05 Y:2001 | 05 | 2001 | USE POWER DURING OFF-PEAK PERIODS | $36,091 | $0 | Implemented |
SD0274 # 06 Y:2001 | 06 | 2001 | INSTALL SKYLIGHTS | $18,319 | $50,000 | Implemented |
SD0274 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $1,712 | $1,000 | Implemented |
SD0274 # 09 Y:2001 | 09 | 2001 | USE OPTIMUM TEMPERATURE | $4,364 | $0 | Implemented |
SD0274 # 12 Y:2001 | 12 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $25,500 | $20,000 | Implemented |
SD0274 # 13 Y:2001 | 13 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,379 | $0 | Implemented |
SD0274 # 14 Y:2001 | 14 | 2001 | MODIFY STARTUP/SHUTDOWN TIMES | $73,321 | $0 | Implemented |
SD0274 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,911 | $440 | Implemented |
CO0476 # 04 Y:2000 | 04 | 2000 | USE EVAPORATION TO CONCENTRATE MATERIAL | $62,600 | $18,400 | Implemented |
CO0476 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,240 | $2,400 | Implemented |
CO0476 # 03 Y:2000 | 03 | 2000 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,310 | $1,000 | Implemented |