IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 3353 Aluminum Sheet, Plate, And Foil
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0257 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,834 $281,530 Implemented
WV0257 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $18,309 $36,855 Implemented
WV0257 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
WV0257 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,738 $220 Implemented
WV0257 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,974 $6,300 Implemented
WV0257 # 12 Y:2003 12 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,542 $1,375 Implemented
WV0257 # 09 Y:2003 09 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,016 $1,000 Implemented
WV0257 # 13 Y:2003 13 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $538 $2,900 Implemented
WV0257 # 14 Y:2003 14 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $954 $110 Implemented
MS0204 # 07 Y:2002 07 2002 DISCONNECT BALLASTS $129 $256 Implemented
MS0204 # 08 Y:2002 08 2002 PAY BILLS ON TIME TO AVOID LATE FEES $89 $25 Implemented
OK0616 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,387 $4,428 Implemented
OK0616 # 10 Y:2001 10 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $540,000 $125,040 Implemented
OK0616 # 02 Y:2001 02 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,570 $1,040 Implemented
SD0274 # 05 Y:2001 05 2001 USE POWER DURING OFF-PEAK PERIODS $36,091 $0 Implemented
SD0274 # 06 Y:2001 06 2001 INSTALL SKYLIGHTS $18,319 $50,000 Implemented
SD0274 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,712 $1,000 Implemented
SD0274 # 09 Y:2001 09 2001 USE OPTIMUM TEMPERATURE $4,364 $0 Implemented
SD0274 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,500 $20,000 Implemented
SD0274 # 13 Y:2001 13 2001 PAY BILLS ON TIME TO AVOID LATE FEES $3,379 $0 Implemented
SD0274 # 14 Y:2001 14 2001 MODIFY STARTUP/SHUTDOWN TIMES $73,321 $0 Implemented
SD0274 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $440 Implemented
CO0476 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $62,600 $18,400 Implemented
CO0476 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $2,400 Implemented
CO0476 # 03 Y:2000 03 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,310 $1,000 Implemented