IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 3353 Aluminum Sheet, Plate, And Foil
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0496 # 02 Y:2014 02 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $35,349 $61,000 Not Implemented
WV0496 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,258 $1,700 Implemented
WV0496 # 13 Y:2014 13 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,130 $680 Implemented
SU0275 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $2,884 $833 Not Implemented
SU0275 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $2,108 $155 Implemented
SU0275 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,109 $11,160 Not Implemented
SU0275 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97,827 $0 Implemented
SU0275 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,818 $800 Implemented
SU0275 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $292,552 $333,015 Implemented
SU0275 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $357 $1,608 Implemented
LE0272 # 04 Y:2008 04 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $17,652 $6,200 Not Implemented
LE0272 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $130,841 $80,000 Not Implemented
LE0272 # 02 Y:2008 02 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $53,138 $6,600 Not Implemented
LE0272 # 03 Y:2008 03 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $18,111 $40,000 Not Implemented
LE0272 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,361 $272 Implemented
LE0272 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,647 $480 Not Implemented
LE0272 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,150 $92,543 Not Implemented
WI0520 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,055 $1,845 Not Implemented
WI0520 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,371 $500 Not Implemented
WI0520 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $252,960 $360,000 Not Implemented
WI0520 # 02 Y:2006 02 2006 PAY BILLS ON TIME TO AVOID LATE FEES $37,087 $0 Implemented
WI0520 # 06 Y:2006 06 2006 INSTALL TIMERS AND/OR THERMOSTATS $135 $350 Implemented
WI0520 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,283 $0 Implemented
WV0257 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
WV0257 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,497 $335 Not Implemented