IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,079

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0469 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,071 $0 Implemented
WI0469 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $626 $0 Implemented
WI0469 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $588 $249 Implemented
WI0469 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $107 Implemented
OK0688 # 02 Y:2004 02 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,034 $2,400 Implemented
OK0688 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $7,575 $3,782 Implemented
OK0688 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,211 $535 Implemented
OK0688 # 05 Y:2004 05 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,882 $3,690 Implemented
OK0688 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $1,846 Implemented
UD0696 # 04 Y:2004 04 2004 ELIMINATE/REDUCE AN OPERATION $9,375 $0 Implemented
UD0696 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,891 $600 Implemented
UD0696 # 08 Y:2004 08 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $1,617 $0 Implemented
UD0696 # 10 Y:2004 10 2004 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $845 $0 Implemented
UD0696 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $486 Implemented
MA0549 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,668 $15,495 Implemented
MA0549 # 04 Y:2004 04 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $8,653 $16,100 Implemented
MA0549 # 06 Y:2004 06 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,412 $0 Implemented
MA0549 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $315 Implemented
MA0549 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,041 $896 Implemented
MA0549 # 09 Y:2004 09 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,021 $1,100 Implemented
MA0549 # 11 Y:2004 11 2004 DISCONNECT BALLASTS $197 $60 Implemented
IA0335 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $474 Implemented
IA0335 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $886 $866 Implemented
IA0335 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,387 $6,232 Implemented
IA0335 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,647 $3,807 Implemented