IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,079

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0157 # 05 Y:2000 05 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $19,669 $800 Implemented
BD0157 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,601 $11,200 Implemented
UD0585 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,367 $32,550 Implemented
UD0585 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,347 $100 Implemented
UD0585 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,729 $16,995 Implemented
UD0585 # 07 Y:2000 07 2000 USE PHOTOCELL CONTROLS $514 $120 Implemented
DS0150 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,552 $15,640 Implemented
DS0150 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $32,699 $30,301 Implemented
DS0150 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $29,468 $37,220 Implemented
DS0150 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $277 $0 Implemented
AR0180 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $110 $258 Implemented
BD0138 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,953 $91,000 Implemented
BD0138 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,839 $4,270 Implemented
BD0138 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $918 $0 Implemented
BD0138 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $800 Implemented
BD0138 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $766 $1,665 Implemented
BD0138 # 11 Y:1999 11 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $139,776 $246,000 Implemented
OR0355 # 01 Y:1999 01 1999 UPGRADE CONTROLS ON COMPRESSORS $44,724 $0 Implemented
OR0355 # 02 Y:1999 02 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,870 $0 Implemented
WI0353 # 04 Y:1999 04 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,159 $22,000 Implemented
WI0353 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,879 $0 Implemented
WI0353 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,440 $640 Implemented
WI0357 # 04 Y:1999 04 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $24,655 $10,800 Implemented
WI0357 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $210 Implemented
WI0357 # 10 Y:1999 10 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,131 $4,017 Implemented