Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
503
matching recommendationsSIC | 3363 | Aluminum Die-castings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0296 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $81,000 | $60,000 | Implemented |
TT0296 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,264 | $1,920 | Implemented |
TT0296 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,690 | $8,100 | Implemented |
TT0296 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $22,207 | $1,640 | Implemented |
WM0194 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,203 | $110,000 | Implemented |
WM0194 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,924 | $39,795 | Implemented |
WM0194 # 04 Y:2023 | 04 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $41,818 | $0 | Implemented |
WM0194 # 09 Y:2023 | 09 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $9,970 | $2,832 | Implemented |
WM0189 # 03 Y:2023 | 03 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,948 | $15,600 | Implemented |
WM0189 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $873 | $5,496 | Implemented |
WM0189 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $683 | $2,500 | Implemented |
WM0189 # 04 Y:2023 | 04 | 2023 | COMBINE UTILITY METERS | $2,274 | $0 | Implemented |
AS0457 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,832 | $676 | Implemented |
AS0457 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,174 | $0 | Implemented |
MZ0254 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,653 | $180 | Implemented |
MZ0254 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,370 | $57,615 | Implemented |
MZ0254 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $384 | $1,000 | Implemented |
MZ0254 # 05 Y:2018 | 05 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,499 | $52,000 | Implemented |
MZ0254 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,434 | $10,000 | Implemented |
MZ0254 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM THICKNESS INSULATION | $49,702 | $20,960 | Implemented |
MZ0254 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,856 | $10,840 | Implemented |
WM0110 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $38,561 | $90,000 | Implemented |
WM0110 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,832 | $23,000 | Implemented |
TT0191 # 05 Y:2017 | 05 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $1,175 | $250 | Implemented |
TT0191 # 01 Y:2017 | 01 | 2017 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $33,156 | $94,000 | Implemented |