IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0150 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,552 $15,640 Implemented
DS0150 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $32,699 $30,301 Implemented
DS0150 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $29,468 $37,220 Implemented
DS0150 # 07 Y:1999 07 1999 $277 $0 Implemented
WI0357 # 10 Y:1999 10 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,131 $4,017 Implemented
WI0357 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $210 Implemented
WI0357 # 04 Y:1999 04 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $24,655 $10,800 Implemented
UM0142 # 07 Y:1999 07 1999 METER WASTE WATER $6,412 $500 Implemented
UM0142 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $7,489 $10,860 Implemented
UM0142 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $39 $0 Implemented
UM0142 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,691 $1,250 Implemented
UM0142 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $450 Implemented
DS0141 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $4,260 $4,500 Implemented
DS0141 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,184 $1,200 Implemented
DS0141 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $13,679 $32,000 Implemented
DS0141 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,348 $900 Implemented
DS0141 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,031 $700 Implemented
DS0141 # 01 Y:1999 01 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,285 $24,040 Implemented
WI0343 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $60 Implemented
UD0564 # 07 Y:1999 07 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,767 $3,375 Implemented
UD0564 # 05 Y:1999 05 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,689 $0 Implemented
UD0564 # 04 Y:1999 04 1999 COVER OPEN TANKS $13,847 $2,400 Implemented
UD0564 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,972 $148 Implemented