IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0514 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $584 $687 Implemented
IA0514 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $140 Implemented
IA0284 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $613 $159 Implemented
IA0284 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $213 Implemented
IA0284 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $18 Implemented
IA0284 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,819 $182 Implemented
IA0284 # 04 Y:2001 04 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,016 $800 Implemented
IA0281 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,253 $1,301 Implemented
IA0281 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,408 $0 Implemented
IA0148 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,474 $5,900 Implemented
IA0148 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,483 $49 Implemented
IA0148 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $1,160 Implemented
IA0148 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $469 $77 Implemented
IA0148 # 08 Y:1996 08 1996 MODIFY MATERIAL APPLICATION METHODS $299 $22 Implemented
IA0143 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,672 $463 Implemented
IA0143 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $282 $25 Implemented
IA0143 # 05 Y:1996 05 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $27,825 $54,500 Implemented
IA0143 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $640 Implemented
IA0120 # 04 Y:1995 04 1995 USE SYNTHETIC LUBRICANT $959 $700 Implemented
IA0120 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $5,311 $115 Implemented
IA0120 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,990 $135 Implemented
IA0045 # 03 Y:1993 03 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,196 $2,893 Implemented
IA0045 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,690 $660 Implemented
KU0257 # 02 Y:1988 02 1988 INSTALL AUTOMATIC STACK DAMPER $2,887 $4,800 Implemented
KU0257 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,063 $750 Implemented