IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,047

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0444 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $1,967 Implemented
SF0444 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,642 $40,100 Not Implemented
CO0681 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,480 $13,140 Not Implemented
CO0681 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $3,470 $900 Not Implemented
CO0681 # 03 Y:2014 03 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $175,400 $229,810 Implemented
CO0681 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,610 $8,490 Not Implemented
IA0498 # 01 Y:2013 01 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,917 $9,898 Not Implemented
IA0498 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $901 $525 Implemented
IA0498 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $753 $660 Implemented
IA0498 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $5,092 $3,443 Not Implemented
IA0498 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $6,316 $3,693 Not Implemented
UD0856 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,482 $8,415 Not Implemented
UD0856 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $720 $300 Not Implemented
UD0856 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $441 $2,025 Not Implemented
UD0856 # 04 Y:2012 04 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,690 $5,370 Not Implemented
UD0856 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,442 $2,160 Not Implemented
UD0856 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,802 $700 Not Implemented
UD0856 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,339 $1,500 Not Implemented
UD0856 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $782 $50 Not Implemented
UD0856 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $1,000 Not Implemented
UD0856 # 10 Y:2012 10 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,452 $30,000 Not Implemented
UD0856 # 11 Y:2012 11 2012 REDUCE VENTILATION AIR $4,756 $8,600 Not Implemented
UD0856 # 12 Y:2012 12 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $27,298 $181,738 Not Implemented
UA0077 # 01 Y:2012 01 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,475 $1,000 Not Implemented
UA0077 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,282 $20,463 Not Implemented