IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,058

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0005 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,410 $9,428 Implemented
UM0005 # 04 Y:1994 04 1994 COVER OPEN TANKS $6,181 $4,762 Not Implemented
UM0005 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $600 Implemented
UM0005 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $561 $200 Implemented
UM0005 # 07 Y:1994 07 1994 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $17,300 $6,600 Implemented
UM0005 # 08 Y:1994 08 1994 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $40,230 $34,000 Implemented
ME0123 # 01 Y:1994 01 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $500 Implemented
ME0123 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,038 $1,500 Implemented
ME0123 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $722 $500 Not Implemented
ME0123 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $816 $750 Not Implemented
ME0123 # 05 Y:1994 05 1994 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $21,216 $52,000 Not Implemented
MA0286 # 01 Y:1993 01 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $32,481 $19,668 Not Implemented
MA0286 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,546 $0 Not Implemented
MA0286 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,588 $5,514 Not Implemented
MA0286 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $11,128 $4,920 Not Implemented
MA0286 # 05 Y:1993 05 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,158 $7,565 Not Implemented
MA0286 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $1,034 $0 Not Implemented
MA0283 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,690 $435 Implemented
MA0283 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,380 $6,000 Implemented
MA0283 # 03 Y:1993 03 1993 RECOVER AND REUSE COOLING WATER $1,407 $200 Implemented
MA0283 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $596 $710 Not Implemented
MA0283 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $548 $151 Implemented
MA0283 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $371 $400 Implemented
MA0283 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $335 $0 Not Implemented
NC0002 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $566 $522 Implemented