IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,012

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0066 # 07 Y:1992 07 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $384 $800 Implemented
AS0066 # 08 Y:1992 08 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $500 Implemented
AS0066 # 09 Y:1992 09 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,623 $200 Implemented
AS0066 # 10 Y:1992 10 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $206,000 $800,000 Implemented
MA0251 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $15,064 $40,000 Not Implemented
MA0251 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $9,500 $1,316 Implemented
MA0251 # 03 Y:1992 03 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,623 $2,472 Implemented
MA0251 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,191 $4,450 Implemented
MA0251 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,099 $2,050 Implemented
MA0251 # 06 Y:1992 06 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,639 $500 Implemented
MA0251 # 07 Y:1992 07 1992 INSTALL SET-BACK TIMERS $273 $90 Not Implemented
MA0251 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $243 $300 Implemented
RU0156 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,324 $577 Not Implemented
RU0156 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,848 $0 Implemented
RU0156 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,041 $63 Not Implemented
RU0156 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,739 $322 Not Implemented
RU0156 # 05 Y:1992 05 1992 IMPROVE LUBRICATION PRACTICES $1,929 $800 Not Implemented
RU0156 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,776 $3,750 Not Implemented
RU0156 # 07 Y:1992 07 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,525 $23,000 Not Implemented
RU0125 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $231 Implemented
RU0125 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $4,619 $1,912 Implemented
RU0125 # 03 Y:1991 03 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,548 $0 Implemented
RU0125 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,308 $0 Implemented
OK0331 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,171 $0 Implemented
OK0331 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,918 $3,000 Not Implemented