IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0225 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,670 $15,000 Implemented
AM0225 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $10,500 $13,000 Not Implemented
AM0225 # 04 Y:1994 04 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,260 $0 Implemented
AM0225 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $730 $200 Implemented
AM0225 # 06 Y:1994 06 1994 USE A RAG RECYCLE SERVICE $1,440 $7,900 Implemented
AM0225 # 07 Y:1994 07 1994 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $290 $0 Implemented
AM0225 # 08 Y:1994 08 1994 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $0 $7,500 Not Implemented
AM0225 # 09 Y:1994 09 1994 MODIFY MATERIAL APPLICATION METHODS $0 $7,500 Implemented
AM0225 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,100 $81,000 Implemented
UM0015 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,226 $15,513 Implemented
UM0015 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,000 $0 Implemented
UM0015 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,498 $16,200 Implemented
UM0015 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,087 $19,430 Implemented
UM0015 # 05 Y:1994 05 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $413 $350 Not Implemented
UM0014 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,126 $13,020 Implemented
UM0014 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,031 $7,886 Implemented
UM0014 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $1,000 Not Implemented
UM0014 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $624 $189 Implemented
UM0014 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,000 $0 Implemented
HO0080 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,842 $4,383 Implemented
HO0080 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,314 $1,500 Implemented
HO0080 # 05 Y:1994 05 1994 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $263,543 $1,260,000 Not Implemented
HO0080 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,282 $2,977 Implemented
HO0080 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,503 $1,976 Implemented
UM0008 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,721 $6,410 Implemented