Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsSIC | 3399 | Primary Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0377 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,883 | $2,400 | Implemented |
SU0377 # 03 Y:2015 | 03 | 2015 | ELIMINATE/REDUCE AN OPERATION | $4,112 | $3,576 | Implemented |
CO0681 # 03 Y:2014 | 03 | 2014 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $175,400 | $229,810 | Implemented |
IA0498 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $901 | $525 | Implemented |
IA0498 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $753 | $660 | Implemented |
WV0436 # 11 Y:2011 | 11 | 2011 | INSULATE BARE EQUIPMENT | $335 | $154 | Implemented |
WV0436 # 10 Y:2011 | 10 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,400 | $1,000 | Implemented |
WV0436 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,227 | $12,576 | Implemented |
WV0436 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,837 | $45,545 | Implemented |
DL0065 # 04 Y:2011 | 04 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $3,970 | $1,158 | Implemented |
DL0065 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,834 | $2,409 | Implemented |
DL0065 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $510 | $50 | Implemented |
SU0301 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $2,477 | $2,028 | Implemented |
LE0310 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,363 | $200 | Implemented |
LE0310 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,225 | $20 | Implemented |
LE0310 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,986 | $2,500 | Implemented |
LE0310 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,484 | $1,420 | Implemented |
LE0310 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,531 | $10,000 | Implemented |
OK0785 # 01 Y:2010 | 01 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,282 | $55,440 | Implemented |
OK0785 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $563 | $0 | Implemented |
OK0785 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,602 | $0 | Implemented |
NC0392 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186 | $577 | Implemented |
NC0392 # 01 Y:2009 | 01 | 2009 | INSTALL EQUIPMENT TO MOVE PRODUCT | $21,004 | $50,000 | Implemented |
NC0392 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $315 | $100 | Implemented |
NC0392 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,657 | $33,097 | Implemented |