Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,255
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0490 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,100 | $1,000 | Implemented |
MA0490 # 07 Y:2001 | 07 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,000 | $0 | Implemented |
OK0620 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,592 | $615 | Implemented |
OK0620 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $238 | $1,470 | Implemented |
OK0620 # 04 Y:2001 | 04 | 2001 | REPAIR AND ELIMINATE STEAM LEAKS | $1,442 | $200 | Implemented |
OK0620 # 05 Y:2001 | 05 | 2001 | INSTALL SET-BACK TIMERS | $8,700 | $1,170 | Implemented |
OK0620 # 06 Y:2001 | 06 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,130 | $40 | Implemented |
UM0192 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $27,600 | $7,600 | Implemented |
UM0192 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,341 | $800 | Implemented |
UM0192 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,130 | $3,850 | Implemented |
UM0192 # 05 Y:2001 | 05 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $700 | $700 | Implemented |
UM0192 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $21,000 | $20,000 | Implemented |
WV0219 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $889 | $100 | Implemented |
WV0219 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,960 | $2,070 | Implemented |
WV0219 # 03 Y:2001 | 03 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $659 | $1,140 | Implemented |
WV0219 # 04 Y:2001 | 04 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,765 | $600 | Implemented |
WV0219 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,137 | $21,787 | Implemented |
WV0219 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,318 | $40 | Implemented |
WV0219 # 09 Y:2001 | 09 | 2001 | INSULATE BARE EQUIPMENT | $1,097 | $64 | Implemented |
WV0219 # 13 Y:2001 | 13 | 2001 | METER WASTE WATER | $2,332 | $800 | Implemented |
UU0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,523 | $125 | Implemented |
UU0008 # 02 Y:2001 | 02 | 2001 | USE SYNTHETIC LUBRICANT | $423 | $400 | Implemented |
UU0008 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,204 | $460 | Implemented |
UU0008 # 04 Y:2001 | 04 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $5,102 | $2,600 | Implemented |
LL0115 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,842 | $0 | Implemented |