IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0319 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $214 $0 Implemented
DS0110 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,901 $3,030 Implemented
DS0110 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $747 $763 Implemented
DS0110 # 07 Y:1998 07 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,270 $1,200 Implemented
AS0220 # 03 Y:1998 03 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,126 $275 Implemented
AS0220 # 04 Y:1998 04 1998 DISCONNECT BALLASTS $355 $15 Implemented
AS0220 # 08 Y:1998 08 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,895 $12,030 Implemented
AS0220 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,801 $100 Implemented
AS0220 # 11 Y:1998 11 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,179 $90 Implemented
AS0220 # 13 Y:1998 13 1998 ADD ADDITIONAL PRODUCTION SHIFT $495,547 $14,720 Implemented
UL0192 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,015 $20 Implemented
UL0192 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $185 $152 Implemented
UL0192 # 03 Y:1998 03 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,083 $0 Implemented
WI0318 # 01 Y:1998 01 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $89,367 $0 Implemented
WI0318 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $555 $0 Implemented
WI0318 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $417 $742 Implemented
WI0318 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $571 Implemented
BD0107 # 01 Y:1998 01 1998 UPGRADE CONTROLS ON COMPRESSORS $19,185 $31,500 Implemented
BD0107 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $750 $300 Implemented
BD0107 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $470 Implemented
BD0107 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,899 $7,000 Implemented
SD0192 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,498 $1,550 Implemented
SD0192 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,631 $13,030 Implemented
SD0192 # 05 Y:1998 05 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $2,099 $1,980 Implemented
SD0192 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,880 $5,000 Implemented