IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0094 # 05 Y:1993 05 1993 IMPROVE LUBRICATION PRACTICES $604 $880 Implemented
AS0094 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $317 $587 Implemented
TN0505 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,734 $4,088 Implemented
TN0505 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,127 $730 Implemented
TN0505 # 04 Y:1993 04 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $6,669 $15,914 Implemented
TN0505 # 07 Y:1993 07 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $525 $1,380 Implemented
TN0505 # 08 Y:1993 08 1993 OPTIMIZE PLANT POWER FACTOR $6,244 $15,800 Implemented
KU0403 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $867 $240 Implemented
KU0403 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $375 $1,301 Implemented
KU0403 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $200 Implemented
KU0403 # 08 Y:1993 08 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $153 $551 Implemented
KU0403 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $161 $480 Implemented
ND0171 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,000 $1,000 Implemented
ND0171 # 13 Y:1993 13 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $124 $0 Implemented
GT0496 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,890 $750 Implemented
ND0161 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $840 Implemented
ND0161 # 05 Y:1993 05 1993 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $527 $80 Implemented
ME0111 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $980 $1,500 Implemented
ME0111 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,270 $2,000 Implemented
ME0111 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $590 $100 Implemented
MA0279 # 01 Y:1993 01 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,082 $2,800 Implemented
AS0088 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $775 $1,485 Implemented
AS0088 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $243 $420 Implemented
AS0088 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $136 Implemented
AS0088 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,290 $650 Implemented