IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

397

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0558 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,200 $4,500 Implemented
MA0558 # 03 Y:2004 03 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,830 $5,000 Implemented
MA0558 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $12,494 $4,680 Implemented
MA0558 # 06 Y:2004 06 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,912 $0 Implemented
MA0558 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,965 $2,690 Implemented
MA0557 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $5,528 $3,118 Implemented
MA0557 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,428 $3,450 Implemented
MA0557 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $1,706 $708 Implemented
MA0557 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $1,340 Implemented
UF0346 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $5,504 Implemented
UF0346 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $942 $210 Implemented
WI0474 # 01 Y:2004 01 2004 $213,585 $150 Implemented
WI0474 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,878 $44 Implemented
WI0474 # 04 Y:2004 04 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $21,301 $39 Implemented
IC0083 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,453 $2,048 Implemented
SD0344 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,981 $35,875 Implemented
SD0344 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,104 $440 Implemented
SD0344 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,399 $18,500 Implemented
WI0473 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,462 $53,600 Implemented
WI0473 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $1,028 $100 Implemented
WI0473 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $619 $640 Implemented
LL0195 # 02 Y:2004 02 2004 USE PHOTOCELL CONTROLS $11,834 $750 Implemented
LL0195 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,732 $4,280 Implemented
LL0195 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $4,294 $1,320 Implemented
LL0195 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $1,111 $3,200 Implemented