IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

413

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0748 # 06 Y:2007 06 2007 INSTALL TIMERS AND/OR THERMOSTATS $34,710 $1,002 Not Implemented
OK0748 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,664 $3,013 Implemented
OK0748 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $559 Implemented
OK0748 # 04 Y:2007 04 2007 OPERATE BOILERS ON HIGH FIRE SETTING $22,448 $2,495 Implemented
OK0748 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $8,337 $8,477 Not Implemented
OK0748 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $22,467 $1,029 Implemented
OK0748 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $6,840 Implemented
OK0643 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,970 $300 Implemented
OK0643 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $3,635 $558 Implemented
OK0643 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $2,012 $3,430 Not Implemented
OK0643 # 03 Y:2002 03 2002 MODIFY WORKLOAD $17,500 $2,500 Not Implemented
OK0643 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,163 $1,440 Implemented
OK0643 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $36,000 $384 Not Implemented
OK0643 # 06 Y:2002 06 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $117,500 $4,800 Implemented
KU0537 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,180 $1,740 Not Implemented
KU0537 # 04 Y:2000 04 2000 METER WASTE WATER $2,980 $1,910 Not Implemented
KU0537 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $200 Not Implemented
KU0537 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $580 $0 Not Implemented
KU0537 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $970 $1,480 Not Implemented
KU0532 # 08 Y:1999 08 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,620 $800 Implemented
KU0532 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,150 $11,640 Not Implemented
KU0532 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,410 $14,000 Not Implemented
KU0532 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $360 Implemented
KU0532 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $450 Implemented
KU0532 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,060 $12,170 Implemented