IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,133

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0094 # 06 Y:1997 06 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $192,343 $16,000 Implemented
BD0094 # 07 Y:1997 07 1997 TREAT AND REUSE RINSE WATERS $16,735 $34,000 Implemented
BD0094 # 08 Y:1997 08 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $150,800 $2,000 Implemented
UD0527 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,177 $200 Implemented
UD0527 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $3,259 Not Implemented
UD0527 # 03 Y:1997 03 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,740 $3,000 Not Implemented
UD0527 # 04 Y:1997 04 1997 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,694 $200 Not Implemented
OK0530 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,605 $0 n/a
OK0530 # 02 Y:1997 02 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,324 $7,801 n/a
OK0530 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $594 $548 n/a
OK0530 # 04 Y:1997 04 1997 INSTALL SET-BACK TIMERS $734 $252 n/a
OK0530 # 05 Y:1997 05 1997 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $172 $0 n/a
OK0530 # 06 Y:1997 06 1997 MOVE PRODUCT USING MECHANICAL MEANS $24,230 $60,000 n/a
OK0530 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $548 $1,040 n/a
OK0530 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,096 $8,570 n/a
NC0121 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $699 $219 Implemented
NC0121 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $999 $200 Implemented
NC0121 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $90 $250 Implemented
NC0121 # 04 Y:1997 04 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $398 $1,998 Not Implemented
NC0121 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,503 $0 Implemented
NC0121 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $462 $355 Implemented
NC0121 # 07 Y:1997 07 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $7,488 $15,000 Implemented
NC0121 # 08 Y:1997 08 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $12,681 $50,000 Not Implemented
NC0121 # 09 Y:1997 09 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $1,375 $2,259 Implemented
AM0305 # 01 Y:1997 01 1997 REDESIGN PROCESS $101,500 $110,000 Not Implemented