Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0387 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $1,412 $780 Implemented
MI0387 # 10 Y:2021 10 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,403 $4,900 Implemented
UD1027 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,612 $0 Implemented
UD1027 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,486 $1,000 Not Implemented
UD1027 # 03 Y:2021 03 2021 RECOVER AND REUSE COOLING WATER $7,993 $0 Not Implemented
UD1027 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $0 Not Implemented
UD1027 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $1,000 Implemented
UD1027 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,443 $0 Not Implemented
UD1027 # 07 Y:2021 07 2021 REPAIR OR REPLACE STEAM TRAPS $6,067 $4,875 Not Implemented
UD1027 # 08 Y:2021 08 2021 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $2,481 $4,300 Not Implemented
UD1027 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,013 $65,250 Implemented
UD1027 # 10 Y:2021 10 2021 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,735 $43,000 Not Implemented
AS0510 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,281 $200 Not Implemented
AS0510 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,025 $18,448 Not Implemented
AS0510 # 03 Y:2021 03 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $13,978 $9,244 Implemented
AS0510 # 04 Y:2021 04 2021 CONTRACT A WOOD PALLET RECYCLING COMPANY $7,800 $453 Not Implemented
AS0510 # 05 Y:2021 05 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $6,879 $560 Not Implemented
AS0510 # 06 Y:2021 06 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,097 $447 Not Implemented
AS0510 # 07 Y:2021 07 2021 UPGRADE CONTROLS ON COMPRESSORS $713 $3,359 Implemented
AS0510 # 08 Y:2021 08 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $690 $40 Not Implemented
LE0503 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,633 $50,000 Implemented
LE0503 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,108 $45,000 Implemented
LE0503 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,254 $17,500 Implemented
LE0503 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,126 $15,100 Implemented
LE0503 # 05 Y:2021 05 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $56,981 $300,000 Implemented