Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0387 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $1,412 | $780 | Implemented |
MI0387 # 10 Y:2021 | 10 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,403 | $4,900 | Implemented |
UD1027 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,612 | $0 | Implemented |
UD1027 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,486 | $1,000 | Not Implemented |
UD1027 # 03 Y:2021 | 03 | 2021 | RECOVER AND REUSE COOLING WATER | $7,993 | $0 | Not Implemented |
UD1027 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,522 | $0 | Not Implemented |
UD1027 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,842 | $1,000 | Implemented |
UD1027 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,443 | $0 | Not Implemented |
UD1027 # 07 Y:2021 | 07 | 2021 | REPAIR OR REPLACE STEAM TRAPS | $6,067 | $4,875 | Not Implemented |
UD1027 # 08 Y:2021 | 08 | 2021 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $2,481 | $4,300 | Not Implemented |
UD1027 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,013 | $65,250 | Implemented |
UD1027 # 10 Y:2021 | 10 | 2021 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,735 | $43,000 | Not Implemented |
AS0510 # 01 Y:2021 | 01 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,281 | $200 | Not Implemented |
AS0510 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,025 | $18,448 | Not Implemented |
AS0510 # 03 Y:2021 | 03 | 2021 | INSTALL SPECTRAL REFLECTORS / DELAMP | $13,978 | $9,244 | Implemented |
AS0510 # 04 Y:2021 | 04 | 2021 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $7,800 | $453 | Not Implemented |
AS0510 # 05 Y:2021 | 05 | 2021 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $6,879 | $560 | Not Implemented |
AS0510 # 06 Y:2021 | 06 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,097 | $447 | Not Implemented |
AS0510 # 07 Y:2021 | 07 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $713 | $3,359 | Implemented |
AS0510 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $690 | $40 | Not Implemented |
LE0503 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,633 | $50,000 | Implemented |
LE0503 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,108 | $45,000 | Implemented |
LE0503 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,254 | $17,500 | Implemented |
LE0503 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,126 | $15,100 | Implemented |
LE0503 # 05 Y:2021 | 05 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $56,981 | $300,000 | Implemented |