Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
415
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0470 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,495 | $365 | Implemented |
MA0470 # 05 Y:2000 | 05 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $1,402 | $280 | Implemented |
MA0470 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $280 | Implemented |
MA0470 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $206 | $450 | Implemented |
MA0459 # 01 Y:2000 | 01 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,945 | $7,695 | Not Implemented |
MA0459 # 02 Y:2000 | 02 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,064 | $150 | Implemented |
MA0459 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $789 | $150 | Implemented |
MA0459 # 04 Y:2000 | 04 | 2000 | OPTIMIZE PLANT POWER FACTOR | $557 | $1,275 | Not Implemented |
MA0459 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $266 | $1,250 | Not Implemented |
MA0459 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $55 | $248 | Implemented |
MA0448 # 01 Y:1999 | 01 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $65,104 | $361,250 | Not Implemented |
MA0448 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,147 | $6,075 | Not Implemented |
MA0448 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,455 | $80 | Implemented |
MA0448 # 04 Y:1999 | 04 | 1999 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $1,558 | $5,000 | Implemented |
MA0448 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $837 | $1,976 | Not Implemented |
MA0448 # 06 Y:1999 | 06 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $558 | $0 | Implemented |
MA0448 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $316 | $1,425 | Implemented |
MA0448 # 08 Y:1999 | 08 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $186 | $880 | Not Implemented |
MA0441 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,168 | $5,704 | Implemented |
MA0441 # 02 Y:1999 | 02 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $43,200 | $3,000 | Implemented |
MA0441 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,964 | $40,000 | Not Implemented |
MA0441 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,069 | $26,625 | Not Implemented |
MA0441 # 05 Y:1999 | 05 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $789 | $0 | Implemented |
MA0441 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $632 | $2,250 | Implemented |
MA0440 # 01 Y:1999 | 01 | 1999 | CHANGE OPERATING CONDITIONS | $29,415 | $130,900 | Not Implemented |