IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0121 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,514 $1,010 Not Implemented
BS0121 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $3,663 $512 Not Implemented
BS0121 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $354 $796 Not Implemented
BS0121 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,509 $810 Not Implemented
BS0121 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $257 $56 Not Implemented
LE0468 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $106,181 $0 Not Implemented
LE0468 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $76,637 $55,000 Implemented
LE0468 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,956 $35,000 Not Implemented
LE0468 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,375 $186,863 Implemented
LE0468 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,988 $50,000 Implemented
LE0468 # 06 Y:2019 06 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $726,896 $16,000,000 Implemented
MA0797 # 01 Y:2019 01 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,419 $18,225 Not Implemented
MA0797 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,247 $16,050 Not Implemented
MA0797 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,353 $500 Not Implemented
MA0797 # 04 Y:2019 04 2019 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,739 $3,000 Implemented
MA0797 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $845 $500 Not Implemented
UA0206 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,997 $12,406 Not Implemented
UA0206 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,372 Implemented
UA0206 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,768 $500 Not Implemented
UA0206 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $66,257 $100,000 Not Implemented
UA0206 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $7,065 $8,101 Implemented
IC0211 # 01 Y:2019 01 2019 USE RADIANT HEATER FOR SPOT HEATING $5,999 $9,168 Not Implemented
IC0211 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,310 $18,709 Implemented
IC0211 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,768 $42,206 Implemented
IC0211 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,829 $4,500 Implemented