Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

230

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0899 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,496 $1,342 Implemented
OK0899 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $594 Implemented
OK0899 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,062 $9,740 Implemented
OK0899 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,648 $3,905 Implemented
OK0890 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,200 $0 Implemented
OK0890 # 02 Y:2014 02 2014 INSTALL COMMON HEADER ON COMPRESSORS $8,687 $4,800 Implemented
OK0890 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,700 $0 Implemented
OK0890 # 07 Y:2014 07 2014 USE MINIMUM SAFE OVEN VENTILATION $30,394 $1,000 Implemented
OK0890 # 05 Y:2014 05 2014 AIR CONDITION ONLY SPACE NECESSARY $6,400 $1,230 Implemented
OK0851 # 05 Y:2013 05 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,400 $44,200 Implemented
OK0851 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $1,900 Implemented
OK0844 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,154 $4,200 Implemented
OK0844 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,922 $21,000 Implemented
OK0844 # 03 Y:2013 03 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,299 $76,750 Implemented
TT0063 # 04 Y:2011 04 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $900 $1,050 Implemented
LL0335 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,558 $4,290 Implemented
LL0335 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $313 $123 Implemented
LL0324 # 01 Y:2009 01 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $51,066 $5,850 Implemented
OK0768 # 13 Y:2008 13 2008 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,952 $64,800 Implemented
OK0768 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,704 $17,980 Implemented
OK0768 # 15 Y:2008 15 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $131,460 $41,080 Implemented
OK0768 # 12 Y:2008 12 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,034 $129,640 Implemented
OK0768 # 14 Y:2008 14 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,760 $7,525 Implemented
LL0280 # 02 Y:2007 02 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,024 $210 Implemented
LL0280 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,405 $1,880 Implemented