IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0036 # 01 Y:2019 01 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,990 $37,155 Implemented
NL0036 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $500 Implemented
NL0036 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,862 $7,623 Implemented
NL0036 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,715 $2,905 Implemented
IA0353 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21 $11 Implemented
IA0353 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $487 $40 Implemented
IA0353 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $603 $444 Implemented
IA0353 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,450 $439 Implemented
IA0353 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $950 $557 Implemented
DS0164 # 10 Y:2000 10 2000 $2,533 $4,000 Implemented
DS0164 # 07 Y:2000 07 2000 USE RADIANT HEATER FOR SPOT HEATING $3,234 $12,690 Implemented
DS0164 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $86 $108 Implemented
DS0164 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $155 $478 Implemented
DS0164 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $466 $237 Implemented
DS0164 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,164 $806 Implemented
DS0164 # 01 Y:2000 01 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,933 $564 Implemented
DS0143 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,400 Implemented
DS0143 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,043 $640 Implemented
DS0143 # 07 Y:1999 07 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,760 $90 Implemented
DS0143 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,177 $7,500 Implemented
DS0143 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $135 Implemented
DS0135 # 09 Y:1999 09 1999 $14,276 $9,589 Implemented
DS0135 # 07 Y:1999 07 1999 INCREASE USE OF AUTOMATION $3,744 $160 Implemented
DS0135 # 06 Y:1999 06 1999 $3,290 $12,726 Implemented
DS0135 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,395 $351 Implemented