Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0797 # 04 Y:2019 | 04 | 2019 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,739 | $3,000 | Implemented |
MA0677 # 03 Y:2011 | 03 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $1,514 | $5,967 | Implemented |
MA0677 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,225 | $200 | Implemented |
MA0677 # 06 Y:2011 | 06 | 2011 | IMPROVE COMBUSTION CONTROL CAPABILITY | $362 | $500 | Implemented |
MA0677 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $107 | $100 | Implemented |
MA0677 # 01 Y:2011 | 01 | 2011 | REDUCE VENTILATION AIR | $9,048 | $2,585 | Implemented |
MA0673 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,078 | $200 | Implemented |
MA0673 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,772 | $540 | Implemented |
MA0673 # 01 Y:2011 | 01 | 2011 | INSULATE BARE EQUIPMENT | $4,145 | $1,370 | Implemented |
MA0530 # 10 Y:2003 | 10 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $692 | $1,275 | Implemented |
MA0530 # 09 Y:2003 | 09 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,271 | $2,750 | Implemented |
MA0530 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,661 | $400 | Implemented |
MA0483 # 07 Y:2001 | 07 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $570 | $2,500 | Implemented |
MA0483 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,650 | $800 | Implemented |
MA0483 # 01 Y:2001 | 01 | 2001 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $8,700 | $0 | Implemented |
MA0474 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,827 | $1,000 | Implemented |
MA0474 # 05 Y:2000 | 05 | 2000 | INSTALL OCCUPANCY SENSORS | $512 | $1,000 | Implemented |
MA0474 # 06 Y:2000 | 06 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $371 | $100 | Implemented |
MA0474 # 02 Y:2000 | 02 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $4,760 | $0 | Implemented |
MA0240 # 01 Y:1992 | 01 | 1992 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $83,013 | $80 | Implemented |
MA0240 # 03 Y:1992 | 03 | 1992 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $16,723 | $11 | Implemented |
MA0240 # 04 Y:1992 | 04 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,460 | $2,355 | Implemented |
MA0240 # 05 Y:1992 | 05 | 1992 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,896 | $0 | Implemented |
MA0240 # 06 Y:1992 | 06 | 1992 | INSTALL SET-BACK TIMERS | $1,400 | $400 | Implemented |
MA0240 # 07 Y:1992 | 07 | 1992 | REPAIR OR REPLACE STEAM TRAPS | $1,348 | $240 | Implemented |