Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
593
matching recommendationsSIC | 3429 | Hardware, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0116 # 05 Y:2006 | 05 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,114 | $0 | Implemented |
IC0116 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $325 | $274 | Not Implemented |
GT0784 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,866 | $1,000 | Implemented |
GT0784 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,015 | $1,782 | Not Implemented |
GT0784 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,500 | $1,200 | Implemented |
GT0784 # 04 Y:2004 | 04 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $14,255 | $35,020 | Not Implemented |
GT0784 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $51,264 | $0 | Not Implemented |
GT0784 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $40,320 | $5,000 | Not Implemented |
GT0784 # 07 Y:2004 | 07 | 2004 | MINIMIZE WATER USAGE | $7,400 | $1,840 | Implemented |
GT0784 # 08 Y:2004 | 08 | 2004 | METER WASTE WATER | $4,010 | $1,100 | Implemented |
GT0784 # 09 Y:2004 | 09 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,685 | $4,550 | Not Implemented |
GT0784 # 10 Y:2004 | 10 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $14,204 | $29,000 | Not Implemented |
OR0454 # 01 Y:2004 | 01 | 2004 | REDESIGN PROCESS | $39,560 | $0 | Not Implemented |
OR0454 # 02 Y:2004 | 02 | 2004 | INSTALL SENSORS TO DETECT DEFECTS | $24,900 | $2,600 | Not Implemented |
OR0454 # 03 Y:2004 | 03 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,720 | $13,080 | Implemented |
OR0454 # 04 Y:2004 | 04 | 2004 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $16,940 | $29,200 | Implemented |
UU0055 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $710 | Not Implemented |
UU0055 # 02 Y:2003 | 02 | 2003 | ADD AREA LIGHTING SWITCHES | $659 | $500 | Not Implemented |
UU0055 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $430 | $1,870 | Not Implemented |
UU0055 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $889 | $349 | Not Implemented |
UU0055 # 05 Y:2003 | 05 | 2003 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,492 | $39,000 | Not Implemented |
UU0055 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,273 | $7,500 | Not Implemented |
UU0055 # 07 Y:2003 | 07 | 2003 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $12,956 | $21,000 | Not Implemented |
SF0272 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,205 | $0 | Implemented |
SF0272 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $542 | $0 | Implemented |